Solar Energy

WAPDA installs smart meters to reduce electricity theft in Lahore

WAPDA engineers installing a smart electricity meter on a residential/commercial building in Lahore under the anti-theft initiative.

1. Introduction: WAPDA’s Smart Move Against Electricity Theft

WAPDA (Water and Power Development Authority), through its distribution arm LESCO, has launched a major initiative in Lahore to install smart meters across residential, commercial, and industrial connections. This technological push is designed to combat rampant electricity theft, ensure accurate billing, and modernize Pakistan’s aging power infrastructure Reddit+1ProPakistani+1Reddit+15MM News+15MM News+15HUM News+4Business Recorder+4Business Recorder+4.

2. What Are Smart / AMI Meters?

Smart meters, also known as Advanced Metering Infrastructure (AMI), are digital devices that record electricity usage in near real-time and transmit it automatically to a central control room. These meters can be single-phase, three-phase, or bidirectional—particularly useful for consumers with solar panels . They replace the older manual meters, eliminating human error, reducing tampering, and introducing features like remote disconnection and tamper alerts Daily Pakistan English News.

3. Government Vision and Strategic Goals

The government aims to curb electricity pilferage, one of the nation’s largest systemic losses, estimated by some sources at billions annually ProPakistani+11Zameen+11Reddit+11. In concert with PM directives urging swift smart meter installation to address overbilling and theft, this move also aligns with broader efficiency and transparency reforms across DISCOs Reddit+4Dawn+4MM News+4.

4. Implementation Strategy: A Phased Rollout

a. Prioritizing High-Risk Areas

LESCO began installing smart meters and scanning devices in regions known for high theft—such as Harbanspura, Babu Sabu, surrounding Ring Road localities and affluent zones like GOR, Cantt, Gulberg, Johar Town, Kasur, Okara, Sheikhupura, and Nankana Sahib Dawn+4Dawn+4Zameen+4.

b. Volume Deployment

LESCO aims to install up to 535,000 smart meters within its five-year infrastructure plan, with about 55,000 already active Business Recorder+8ProPakistani+8MM News+8.

c. Technology & Equipment Upgrades

In addition to smart meters, LESCO is deploying aerial bundled cables (ABC), insulated conductors, and scanning metres on transformer feeders to monitor and prevent tampering Dawn+3ProPakistani+3MM News+3.

d. Centralised Monitoring & Control

All installations are connected to a central control centre via SIM-enabled networks. This enables remote disconnections for non-payment, real-time anomaly detection, improved outage management, and accurate billing Business Recorder+2MM News+2Business Recorder+2.

5. Technical Features & Capabilities

  • Real-time data transmission: Hourly or half-hourly readings eliminate reliance on manual meter readers Dawn
  • Tamper alerts: Unauthorized bypass attempts or theft triggers immediate signals Business Recorder
  • Remote management: Enables control room to disconnect and reconnect services as needed Business Recorder+1Business Recorder+1

6. Benefits for Stakeholders

StakeholderBenefit
ConsumersAccurate bills, timely notifications, fewer complaints
LESCO/WAPDAReduced losses, higher recovery, improved service reliability
NationLower non-technical losses, better fiscal health
EnvironmentLess energy wastage, more efficient consumption and system usage

Already, LESCO’s drive has recovered over PKR 4.23 billion through detection bills and PKR 35.12 billion from billed defaulters; scanning projects save an estimated PKR 100 million annually Business RecorderReddit+2Reddit+2HUM News+2samaa.tv+12en.wikipedia.org+12Reddit+12Reddit+9Business Recorder+9Reddit+9HUM News+3ProPakistani+3Zameen+3.

7. Early Results & Success Stories

  • Lahore’s industrial belt: Theft losses have dropped by ~7%, following replacement of over 3,000 meters with AMI units Dawn+6Dawn+6MM News+6.
  • High-income districts: GOR, Cantt, and Gulberg have seen fewer theft reports after deploying ABC cables and insulated conductors Dawn+3ProPakistani+3MM News+3.
  • Reading accuracy improved, significantly decreasing disputes and overbilling complaints.

8. Challenges & Mitigation

a. Infrastructure & Logistical Hurdles

Deploying hundreds of thousands of meters across diverse urban and peri-urban zones requires efficient distribution, electricity supply coordination, and personnel training.

b. Financial Constraints

Smart meter acquisition and network upgrades need significant upfront investment. LESCO’s initial budget allocation reaches up to PKR 1.6 billion, with broader AMI rollout pegged at PKR 170 billion MM News+1Daily Pakistan English News+1.

c. Human Resistance

Some power theft is enabled by corrupt insiders; identification and suspension actions have been taken against over 1,400 officials, including 97 senior officers Zameen+3ProPakistani+3Dawn+3.

9. Policy & Regulatory Support

The program has strong government backing:

10. Future Outlook

  • Scaled roll‑out: Completion of all 535,000 meters across WAPDA’s Lahore region territory
  • Data‑driven grid upgrades: Insights from smart data to improve network resilience and load balancing
  • Consumer empowerment: Web and mobile dashboards to track individual usage
  • Industry replication: Expansion to other provinces, replicating Lahore’s pilot model

Fazeel Ayaz Qasimi

About Author

Leave a comment

Your email address will not be published. Required fields are marked *

You may also like

Solar Energy

Pakistan’s Solar Power Boom: Key Insights and Challenges

Pakistan has witnessed a rapid transition to solar power, primarily due to a 155% increase in electricity tariffs over three
Solar Energy

Pakistan Enforces Energy-Efficient Building Code

Pakistan makes its Energy Conservation Building Code (ECBC 2023) mandatory for all new residential projects to cut energy waste.